WHAT WE OFFER
PAST
Concrete Services was founded in 1999 with a crew of less than 10 employees, 2 trucks, and 1 slipform machine. Concrete Services soon landed a three year contract in Palm Beach County with FDOT and began to shift operations to South Florida. Through the years we have continued our focus on creating value for clients by saving them time and money through strategic management.
PRESENT
No one constructs more concrete on the roads of Florida than Concrete Services. We are currently based out of Boynton Beach, Florida with offices in Fort Lauderdale, Miami, Tampa, and Deland. Concrete Services operates with a staff of nearly 200 skilled craftsman and employees. Our fleet of slipform machines, concrete pump trucks, backhoes, dump trucks, and concrete paving equipment allows us to drastically reduce wait times for our clients.
FUTURE
We are continuously striving to maintain vertical integration in every discipline that we offer so that we are always in control of our schedule and always on time. Our pride comes from our record of safety, professionalism, and commitment to completing every job right and on time. No excuses.
OUR STORY
concrete services, florida, west palm beach, concrete services llc, concreteservices.net, south florida, shawn free, concrete paving, concrete coping, concrete plant, portable concrete plant, barrier walls, concrete, concrete bridges, sound walls, bridges, concrete sound walls, concrete production, concrete paving, florida, palm beach, south florida, central florida, concrete pumps, concrete slip form machines, concrete company, cement,
Because time is of the essence.
PROJECTS
CONCRETE PAVING
___
Our paving spread includes Guntert & Zimmerman and Miller Formless pavers, CMI placer spreaders, and Gomaco texture cure machines. We are proud to have constructed the largest paving project in Florida in the last ten years.
PORTABLE CONCRETE PLANT
___
With a cement storage capacity of 900 tons & 20 dump trucks running simultaneously, our portable double drum Erie Strayer concrete plant averages 2,000 cubic yards or .75 lane miles per day.
COPING
___
We install coping six times faster than our competition by using a patented slip forming method with exposed rebar.
BARRIER WALLS
___
Our fleet of slipform machines allows us the ability to construct barrier walls as quickly and efficiently as possible with variable roadway height barrier wall installations as tall as 12.5 feet.
BRIDGES
___
Our bridge capabilities range from piling & foundations to mass substructure & decks. We control our schedule with in house ironworkers, carpenters, finishers, cranes, & concrete trucks.
SOUND WALLS
___
Our fleet of concrete pumps and variety of slipform machines allows us to build sound walls in any size and configuration. We install the traffic rail portion of sound walls ten times faster by using a patented slip forming method with exposed rebar.
_________________________________________________________________________
SR 826 (PALMETTO EXPRESSWAY) & SR 836 (DOLPHIN EXPRESSWAY)
Prime Contractor: deMoya/Condotte/Community Joint Venture
City: Miami, FL - $559 Million
The SR 826 / SR 836 Interchange is a four level interchange in the heart of Miami-Dade County adjacent to the Miami International Airport and includes reconstruction of approximately 2 miles of SR 826 and 3 miles of SR 836 to provide 5 lanes in each direction.
___
Prime Contractor: deMoya/Condotte Joint Venture
City: Deland, FL - $134.4 Million
Fourteen miles of widening and reconstruction with concrete pavement utilized for the final wearing surface.
___
Prime Contractor: Skanska/Ajax Joint Venture
City: Tampa, FL - $215.4 Million
Rebuild and widen Interstate 275 from east of State Road 60 to the Hillsborough River in downtown Tampa. This project included reconstruction of all of the southbound interstate in that area, as well as northbound I-275 from east of State Road 60 to Himes Avenue.
I-275 RECONSTRUCTION
___
Prime Contractor: The deMoya Group
City: Miami, FL - $143 Million
This project provides for the implementation of express lanes along this segment of the HEFT, as well as for the Miami-Dade Expressway Authority (MDX) to incorporate a major extension of SR 874 through the heart of the HEFT/SR 874 interchange.
HEFT (TURNPIKE EXTENSION) FROM EUREKA DRIVE TO KILLIAN PARKWAY
___
Prime Contractor: Community Asphalt Corp.
County: Palm Beach and Broward - $32.5 Million
Bridge and roadway widenings of five interchange improvement projects throughout Broward and Palm Beach counties: Hillsboro Boulevard to SW 10 ST, 10 Ave North, Donald Ross Road, Woolbright Road, and Hypuloxo Road.
I-95 INTERCHANGE IMPROVEMENTS
___
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________